I NSPECTION P ROJECTS
BY
TOR ENGINEERING
- Sundance to Coolidge 230kV Transmission Line, Arizona
Conducted inspection of Transmission Line installation and made sure the contractor followed specifications and construction methods requested by the owner.- Tracy 500kV Substation, Tracy, California
Conducted inspection of the installation of three (3) 525kV auto transformers, twelve (12) 525kV PCB's, and all related switches, foundation structures, buses, cable, and trench.- Lone Butte Substation, Maricopa County, Arizona
Conducted day-to -day construction inspection of a new 5-bay 69kV substation and all related switches, foundations, steel structures, and wiring and provided regular inspection report submittals.