ELECTRICAL ENGINEERING - INSPECTION


I NSPECTION P ROJECTS
BY
TOR ENGINEERING

  1. Sundance to Coolidge 230kV Transmission Line, Arizona
    Conducted inspection of Transmission Line installation and made sure the contractor followed specifications and construction methods requested by the owner.
  2. Tracy 500kV Substation, Tracy, California
    Conducted inspection of the installation of three (3) 525kV auto transformers, twelve (12) 525kV PCB's, and all related switches, foundation structures, buses, cable, and trench.
  3. Lone Butte Substation, Maricopa County, Arizona
    Conducted day-to -day construction inspection of a new 5-bay 69kV substation and all related switches, foundations, steel structures, and wiring and provided regular inspection report submittals.

Back to Projects > Inspection